Volex Labs / Calculations / Composite metal-deck slab design to Eurocode 4.

Composite metal-deck slab design to Eurocode 4.

Enter the deck profile, slab depth and span, and Volex Anvil designs the composite slab in two stages: the profiled decking acting alone at the construction stage (strength and deflection under wet concrete), and the composite slab in service — the moment resistance, the longitudinal shear by the m-k or partial-connection method, and the composite deflection.

The two-stage design follows EC4 §9, so the construction-stage deflection and the composite capacity match the code and the decking manufacturer load-span tables.

Free account · 10 calculations/month · no card required · Pro £29/month

What Volex Anvil checks

Validated against the published example

Composite slab — design moment and construction deflection EC4 §9 (EN 1994-1-1); manufacturer decking load-span data
QuantityPublishedVolex AnvilError
Design moment MEd16.04 kNm/m16.04 kNm/m0.02%
Construction deflection (propped)2.28 mm2.28 mm0.00%
This case is one of 359 published checks the platform passes — the full table, with every source and every error, is public at volexlabs.com/verification.

Frequently asked

Does it check the construction stage?
Yes — the profiled decking is checked acting alone under the weight of wet concrete and construction loads, propped or unpropped, which often governs the deck gauge.
Which longitudinal-shear method?
Either the empirical m-k method or the partial-connection method of EC4 §9.7.3, depending on the decking data available.
Is it validated?
The design moment and construction deflection are checked against EC4 — within 0.02%.
Free tier?
Yes — 10 calculations a month free; Pro (£29/month) adds unlimited runs and PDF calc sheets.

Related calculations

Check it in the code, not in a black box.

Every result carries its clause references. Free tier, results in seconds.